Bathroom Installation: The Installation Method Of the Whole Bathroom

bathroom installation the installation method of the whole bathroom

With the development and improvement of the design, the whole bathroom has a new interpretation: that is, in the limited space to achieve washing, bathing, dressing, toilet and other functions of the independent health unit. It uses an integrated waterproof chassis, panels, and cover of the overall framework, and sanitary ware, bathroom furniture, bath screen, bathtub, faucet, shower, tile accessories, such as integration into a whole environment.

Overall bathroom installation steps:

1, sit process toilet: check the ground sewer pipe, nozzle, flat is to draw a good mark to play, with putty, hole rubber pad, a screw on the nut and the water tank on the back of the two side hole drilling, bolt insertion mark, drawing, twisting, hanging back water tank. Leveling and alignment, back to install water tank nut screw, elbow installed splayed door to  lamp fork curved float to insert and tighten the nut, splayed door.

2, wash basin process: expansion bolt inserted, twist firmly, pot basin rack hanging good: the basin on the shelf to find the formation of water to connect: washbasin, straightening, water connection.

3, the process of bath tub installation: to sewer installation, water tight sealing putty leveling and alignment test.

4, the process of the shower: cold and hot water pipe with smooth tube, a short amount for size, installed in the shower nozzle, water inlet with lead oil, copper wrapped nut, fixed on the wall, the upper tube installed in the three opening, wood screws fixed on the wall.

Process 5, bidet: hot and cold mixed switch, the Watergate door cover and nut even and straight, installed to the Watergate doors installed, cold and hot nozzle rotating core outlet nut, the Watergate hybrid switch on nut, installed three gate door cover to magnetic basin installed to install the nozzle to install to install portable nozzle to adjust the positioning rod.