What are the aspects should be paid attention in the bathroom decoration?

Although the bathroom is small, it has a lot of functions in home life. Bathroom space is the most afraid of the installation process is careless, resulting in the need to be completely knocked out again in the future. This will not only cost energy, but also increase unnecessary spending. BARANA teaches you how to choose and accept bathroom equipment, and build a perfect bathroom.

Pay attention to the bathroom number of holes in the water. According to the number of water holes to buy, prevent trouble after replacement. The wash basin without holes should be installed on the stage or installed on the wall of the face table. The cold and hot water pipes of the single hole basin are connected to the single handle faucet through a hole, and the bottom of the tap is provided with a silk hole, and is fixed on the hole with nuts. The three hole basin can be matched with a single handle cold and hot faucet or a two handle cold and hot faucet. It is suggested that different wash basin should be chosen according to the number of outlet holes, so that they can not be used when buying them.

Wash basin should pay attention to the overall height relationship, the height of the intake system should be done according to the standard draft. Generally, U type pipe fittings need to be put in place in right way to ensure that water pipes and wall drainage holes are effectively combined and watertight, so as to avoid water leakage. In addition, if damage is found during installation, it should be dealt with immediately to avoid subsequent damage or breakage. The edge of wash basin and mesa should be treated with waterproof and edge treatment. At the same time, if there is a storage cabinet under the table type basin, the bathroom cabinet should choose waterproof material or joint point to do waterproof treatment. Silicone can be used to protect each junction point from water penetration. Fill the gap between wash basin and meshwork and fill up with silicone for waterproofing.

Pay attention to the distance of the tube before installation. The toilet tube distance is usually 30 centimeters or 40 centimeters away. Although some toilet tube distance are not limited at present, if there is a brand or style in your favorite list, the length of the tube should be inquired first , it is suggested that the size of the tube should be asked to avoid the improper installation. Hard plug is prohibited when installation. During installation, it is forbidden to press hard or squeeze hard with strong combination, locking or using heavy objects to avoid cracks. The intelligence toilet needs to be reserved for distribution outlets and water intake installations. When designing, we need to reserve electrical outlets and water intake. Now many new houses are most likely to set up the power supply in the vicinity of the toilet drainage pipe, but the second-hand housing or the old room usually does not have a reservation, and the need for another wire to affect the overall beauty. Therefore, we need to consider whether we need to install smart toilets when old buildings are being transformed. The edge treatment of two-piece toilet. When fixing the toilet, pay attention to the alignment of the base and drainage holes and the treatment of floor tiles, so as to avoid bad drainage and produce peculiar smell.

More drainage holes are left under the bathtub. Bathtub base should pay special attention to waterproof, drainage, waterproof paint and then install a bathtub, do not perfunctory. It’s best to leave a drainage hole below. In case there is a real leakage of water, also can drain from the drainage hole in time without causing down-hole seepage. At the same time, when the bathtub is installed, the supporting degree of the side wall should be considered enough. If the wall is not properly supported, once the water volume will cause the bathtub to move up and down, it will create cracks and water seepage.

More attention should be paid to the combination of the bathtub and the side wall. Avoid sharp corners, seams and accumulated water. If you choose freestanding bathtub, the biggest advantage is that you can place your place with joy. When installing, it is usually fixed on the base of the base by using silicone. BARANA suggests using mould proof ingredients. It is not easy to mould and cause the trouble of cleaning in the future.

Massage bathtub test. In the massage bathtub, the motor maintenance holes should be reserved. The location of the socket should not be too long, and the connection must be fixed. Otherwise, it will leak electricity due to loosening. The power supply contacts must be checked, and the leakage devices should be tested. The shower room glass door should be carefully selected. When you install glass sliding doors, you can choose to strengthen the material glass to avoid single point impact damage. In addition, it is necessary to consider the problem of load carrying capacity; the aluminum frame type should pay attention to the combination point, the lubrication of the track, the size level and the water stop effect after closing the closed door.